PEX loops laid out over a slab, a manifold to a zone, with the material list, a heat load if you want one, and a submittal to hand in and to lay the tube from.
Open it from Shop > Radiant heat layout... or type /radiant (/pex and
/hydronic do the same). Select the floor first. Nothing goes on the drawing until you press
Draw the layout, and Cancel or Esc leaves the drawing as it was. The radiant tools are an add-on:
the first time, they ask for the license number that came with it, and once it is accepted they do not ask
again.
You give it the floor and where each manifold hangs. It lays the tube in rows at the spacing you ask for, parallel to the manifold's wall, in loops that go out and come back on neighboring rows. Every loop is a round trip from the manifold and back, and its length - both leads included, plus 6 ft for the climb up the wall to the manifold and the tube fanned out onto the grid there - is kept under the longest loop you allow. No loop crosses another, and the tube stays 6" off every wall and obstacle.
It does not lay one layout and stop. It searches: it tries many layouts for each zone and keeps the best ones, ranked by how much of the floor they reach, how close the loop lengths come to each other, and how easy they are to lay. You pick the one to build, or take the best.
A face that is the same shape as a hole in another selected face is left out on its own - it is the column drawn inside the slab, not a zone. With nothing selected, the wizard does not open and says to select the floor first.
The column on the left. A bare number is inches for the spacing and feet for a loop - 9 is
9", 300 is 300 ft. A foot or inch mark, or a metric size, is read as written.
| Setting | What it is |
|---|---|
| Tube | 3/8", 1/2", 5/8" or 3/4" PEX. |
| Spacing, on center | How far apart the rows are. 9" to start. |
| Longest loop | The most tube in one loop, manifold and back. Blank is the tube's own: 200 ft for 3/8", 300 ft for 1/2", 400 ft for 5/8", 500 ft for 3/4". |
| Most loops a manifold | 2 to 64, 12 to start - most makers stop at twelve. A zone that wants more is yours to split in two; the wizard does not put a second manifold in it. |
| Search until ... % of the floor covered, and the loops within ... % of each other | The goals. A search keeps going until its best layout meets both, or you stop it. 0 is no goal. 97% and 10% to start. |
| Loops in hooked pairs, to even them | Two neighboring loops share their rows, split by one hook at the far wall. Ticked, the search tries these alongside plain layouts. |
| Show the labels | The loop and manifold notes on the drawing. Unticked, they are still built, but put
away - /show labels brings them back, /hide labels puts them away again. |
| Job name | Goes on the submittal and names the zones' groups - Smith residence. |
The settings are remembered from one job to the next; the job name is remembered for the floor it was given to. Changing the tube, the spacing, the longest loop or the most loops a manifold throws away every zone's layout, since the tube can no longer go where it went: search again.
The slab is not asked about. The wizard takes a 4" concrete slab, the tube centered in the pour, R-15 under it, and says so on the material list and the submittal.
The plan in the middle shows the floor north up, with a compass in the corner. Each zone is outlined, holes are shaded gray, and each manifold is a small numbered box - the one you are working on is yellow. Once a zone is searched, every loop is drawn in its own color, so you can follow one run by eye.
When the wizard opens, it puts a manifold in every zone, tight to a wall, toward the middle of all the zones - where the boiler most likely is. Suggest manifolds puts them all back there.
Under the plan there is a tab for each zone, and All zones when there is more than one. Click a zone on the plan and its tab comes up. A zone's tab has:
Moving or turning a manifold throws away that zone's layout. The other zones keep theirs.
When a search is stuck, as a last resort it may slide the manifold along its wall a few feet, and the material list says how far it moved it. Tick Keep the manifold where I put it when the spot you picked is the only place it can hang. It is remembered for that zone.
A closed shape in the selection that is not floor to heat - a chase, a column against a wall - can be left out. Pick its tab and press Not a zone, or right-click it on the plan for Zone N is not a zone - leave it bare. It turns gray on the plan, gets no tube, and stays out the next time you open this floor. The last zone cannot be left out.
To bring them back, right-click the plan: Bring back the shapes left out. Every one left out comes back as a zone, with its manifold where Suggest would put it.
Right-click a manifold, or inside a zone, and the menu acts on that zone:
A search takes seconds a zone on a real floor, longer on a big one, so nothing is searched until you ask. Press Search this zone on its tab, Search all zones, or use the plan's right-click menu. A zone not searched shows no tube, and Draw the layout stays off until every zone has been searched.
A layout only meets the goals when it covers enough, its loops are within the spread you gave, no join runs through an obstacle, it needs no more loops than a manifold takes, and it is friendly enough to lay (below). Each search starts from a new random point, so searching a zone again can find a different layout.
When a coverage goal is more than the tube can reach - say twelve loops of 300 ft at 9" on a 3,000 sq ft zone - the zone's tab says so before you search, with what to change: a wider spacing, a longer loop, more loops a manifold, or the zone split. The search then works toward what the tube can reach.
While it searches, a window stays up over the wizard. It shows which zone it is on (and which of how many), a bar, the layouts laid a second, and the best so far - how much it covers, how close its loops come, and how many loops. Everything in it can be changed while it runs:
| Control | What it does |
|---|---|
| Goals | The same two goals as the wizard's. Change them here and the search works to the new goals from the next layout. What you leave here is the wizard's goals afterward. |
| Give up after | Never, or 1, 5, 15 or 30 minutes, or 1 hour, a zone. Past it, the zone keeps the best it found and the next zone starts. |
| Less friendly layouts too, to meet the goals | Off, the search keeps to layouts an installer lays easily - 85 of 100 or better. Tick it to let it lay harder loops when that is the only way to meet the goals. |
| Hooks at the far wall | A loop run on over its neighbor's first two rows, to even the loop lengths - four bends. Untick it and hooks are never tried. |
| Found so far, best first | The layouts it has kept. Click one to see it drawn beside the list and to keep it as the zone's layout; double-click one to stop and keep it. |
| Stop - keep the best | Ends this zone with the best it has, and goes on to the next zone. |
| Stop all | The same, and searches no more zones. |
Give up after, less friendly and hooks are remembered for next time. While the window is up, the wizard cannot be changed or closed.
A search keeps up to 24 layouts a zone. Each line in the list, best first, reads:
Click a line in the zone's Layouts found list and that is the layout the zone shows and will build. The material list says which of how many it is.
Each loop is scored out of 100 for the person laying it. A plain serpentine block, set out from two measurements, is 100. A loop loses points for every measurement past two it takes to set out - where its rows stop short of a wall, and where its lead runs - for bends past a plain serpentine's, and for reaching out past its own block of floor into the others'. A layout's score is the average of its loops'.
Two bars over the plan, over the zones searched so far:
Green is good, amber is part way, red is poor.
The material list for a zone gives the tube and spacing, the floor area, the loops, the manifold's size and about how much wall it takes, every loop's length, and then:
The line in red just above Draw the layout says what stops the layout: a size that does not read, or a zone with no layout.
Heat load... opens a window of its own. It is optional: a layout builds without it, and the submittal only carries a heat load once you use one. Once you do, the button reads Heat load - in.
It is a simplified heat loss - walls, glass, doors, ceiling, the slab's edge and the air that leaks in - at the code U-values for the climate zone, worked out as you type. The answers are remembered for that floor.
| Setting | What it is |
|---|---|
| Outdoor design | The 99% winter low for the town, degrees F - ask the supplier or look it up (ASHRAE). |
| Indoor | 68 F to start. |
| Climate zone | The IECC climate zone, 1 to 8. ? opens the Department of Energy's guide in your browser, which lists every county's zone. |
| Glycol | Percent propylene glycol in the water. It carries less heat and is thicker, so the flow and head go up. |
| Altitude | Feet. Past 2,000 ft the boiler is derated 4% for every 1,000. |
| The boiler makes the hot water too | A combination boiler. Tick it and give the number of bathrooms; the boiler is sized for whichever is larger, the heating or the hot water. |
The plan shows the zones. Click a wall to change it, round and round: blue is an outside wall, orange a wall to a space not heated - a garage - and gray an inside wall. A wall two zones share is always inside. To start, every wall no other zone shares is taken as outside. Click inside a zone, or pick it from the list, to fill in that zone.
| Setting | Choices |
|---|---|
| What it is | Slab on grade; slab over a heated space; joists with plates, over a crawlspace; snow melt. |
| Above it | Attic, insulated to code; roof, insulated to code; heated space; bare metal roof. |
| Outside walls | Up to code; older - R-11; bare metal. |
| Slab insulation | Under it all, to code; R-10 at the edge only; none. Slab on grade only. |
| Floor covering | Bare concrete; tile or stone; vinyl or laminate; wood; carpet and pad. |
| Air tightness | Tight - new, sealed; average; leaky - old, drafty. |
| Snow melt | Residential walks and drives; commercial; must stay clear - ramps, hospitals. Snow melt only. |
| Header to boiler | How far the pipe runs from this zone's manifold to the boiler, one way: up to 20 ft, 20 to 50, 50 to 75, 75 to 100, 100 to 150. |
| Ceiling height | Feet. |
| Windows | Square feet of glass in the zone's outside walls, all told. |
| Overhead doors | Square feet of them. |
A snow melt zone asks only for its class; it is a rate over the surface, not a loss, and is kept apart from the heating load.
For the zone you are on:
And the boiler for all the zones: the heating, 5% for the piping, the hot water if it makes it, the altitude derate, the rated output it needs at least, the input at about 95% efficiency, how far down it should modulate (the smallest zone), and the snow melt, alone and with one boiler doing both.
Use it puts the heat load in the submittal. Leave the heat load out takes it out. Cancel keeps what was there before.
Export the submittal... saves the job as a PDF - on letter paper, or A4 for a metric drawing - or as plain
text if you pick a .txt file. It is named for the job to start with. Preview the PDF writes
the same PDF where nothing is kept and opens it in your PDF reader, so you can look it over first.
It covers the zones searched so far; a zone not searched says it has no layout. In order:
Every sheet has a title block: the job, the date, the program's version, and sheet N of M. A scale bar reads true even printed "fit to page", where a stated scale would not.
Draw the layout puts the layout on the drawing exactly where the floor is - nothing to place afterward - and leaves what it built selected. It builds the layouts the wizard showed; it does not search again. For each zone:
/hide labels and /show labels put them away and back.The runs are reference lines, like a dimension's own line: they draw in full but never close faces with the floor. Undo takes the whole build back in one step.
The drawing keeps the whole job in the zones' groups - the settings, every zone and manifold, the names, the heat load and each zone's layout. Click a zone's group and right-click it for:
Only the layout each zone built keeps its loop paths. The other layouts its search kept are kept as a record - how much they covered, their bends and lengths - for the design record. Pick one of those in a reopened wizard and it says Only the built layout was kept - search again for the rest.
Layouts built before 28 September 2026 did not keep their job, so these two items do not show for them. Select the floor and run the wizard again.
| Number | Value | Where from |
|---|---|---|
| Longest loop | 3/8" 200 ft, 1/2" 300 ft, 5/8" 400 ft, 3/4" 500 ft | Tubing makers' install manuals and Radiant Professionals Alliance guidance - the low end of each quoted range |
| Tightest bend | 8 times the tube's outside diameter for PEX-B and PEX-C, 6 times for PEX-A | The same |
| Spacing | 6" to 12" covers most slabs; 9" the everyday default | The same |
| Under the slab | R-15 at least | The same |
| Tube off walls and obstacles | 6" | Trade practice |
| Manifold sizes | 2 to 12 loops | What the makers offer |
| Manifold wall space | 2" between connections, supply and return side by side, and 12" for the valves and end caps | A rule of thumb |
| Rolls | 100, 300, 500 and 1,000 ft, and 400 ft for 3/8" and 5/8" | What oxygen barrier PEX is commonly sold in (Uponor hePEX, Sioux Chief, BOW, the box stores) |
| Ties or staples | One every 15" | An estimate |
| Heat load tables | U-values, slab edge F-factors, air changes, floor output, pipe sizing | IECC 2021, ASHRAE Fundamentals and HVAC Applications, ASHRAE 90.1, EN 1264, ASTM F876 - listed value by value in the submittal |